Friday, June 17, 2011

SCM601 - Unit 4 - Lesson 1

Goods Issue Posting for Cost Centers


When withdrawing warehouse materials to be debited to cost center , the goods issue in IM is the start of the process. If the issung storage location is linked to warehouse in customizing, a TR is generated for the material quantity to be be withdrawn , in addition to the material and accounting documents. At the same time , this quantity is mapped as a negative quant in the interim storage area goods issue zone.


A material withdraw for a work order for production is mapped in the same way, as long as you are not using the WM-PP interface . This means that a goods issue is posted for the work order in IM (standard movement type is 261) . This posting generates a negative quants in the goods issue zone for work order (standard storage area 914 ).

No comments:

Post a Comment